Rudra Green Ship Recycling
Home/Recycling Process

Green Ship Recycling

A controlled, HKC-compliant recycling process.

Every vessel that enters the Alang yard moves through a defined sequence — from pre-arrival documentation to final material recovery — designed around Hong Kong Convention standards.

At a glance

Process stages
6
Standard
HKC Compliant
Location
Alang, Gujarat

The recycling process

From beaching to material recovery.

01

Pre-arrival & documentation

The vessel's Inventory of Hazardous Materials (IHM) and ship recycling plan are reviewed against HKC requirements before the vessel is accepted into the yard.

02

Beaching & positioning

The vessel is beached at high tide into a designated cutting position, allowing controlled access along the full length of the hull.

03

Pre-cleaning & waste removal

Fuel, oils, and hazardous liquids are drained and removed before any cutting begins, in line with HKC pre-cleaning requirements.

04

Controlled dismantling

The hull is sectioned in a planned sequence, from superstructure down, using designated cutting zones — with a separate zone for oil material handling.

05

Waste segregation

Recoverable steel, hazardous waste, and other materials are segregated at the point of cutting and routed to their respective handling areas.

06

Material recovery & disposal

Steel is prepared for re-rolling and resale; hazardous waste is disposed of through certified facilities in accordance with pollution control regulations.

This sequence reflects the general HKC-compliant ship recycling process. Confirm with the yard team that each step and description accurately matches Rudra's actual operating procedure before this page goes live.